摘要
通过顶拱混凝土施工移动式钢管排架技术的研究和在糯扎渡水电站左、右岸泄洪洞斜坡渐变段的应用分析,提出了顶拱混凝土施工模板支撑技术新方法,尤其是在渐变结构混凝土施工中实现了施工方案的经济、安全、快速。
Through the research on the movable steel pipe bent technology of arch concrete construction and the application analysis in the slope transition section of the spillway tunnel on the left and right banks of Nuozhadu Dam,a new method of arch concrete construction formwork support technology is proposed,especially in the construction of transition structure concrete,which realizes the economic,safe and fast construction scheme.
作者
柴喜洲
CHAI Xizhou(China Anneng Group First Engineering Bureau Co.,Ltd.,Nanning 530028,Guangxi,China)
出处
《水利水电技术(中英文)》
北大核心
2023年第S02期220-223,共4页
Water Resources and Hydropower Engineering
关键词
糯扎渡水电站
顶拱混凝土
移动式钢管排架
行走钢平台
行走系统
钢管排架
Nuozhadu Hydropower Station
top arch concrete
mobile steel pipe rack
walking steel platform
walking system
steel pipe rack