结合优先级的多变量报警阈值优化方法

Multi-Variable Alarm Threshold Optimization Method Based on Priority
下载PDF
导出
摘要 现阶段,“报警泛滥”现象普遍存在,其主要由于报警阈值设置不合理导致,这种现象超出操作员操作范围。化工过程关联特征复杂,异常工况发生易诱发多个变量报警,融合专家知识和数据统计的方法挖掘报警变量间的内在关联,结合优先级进行多变量报警阈值优化研究。采用主元分析法初步确定变量的重要程度,针对数据统计的缺陷,通过标定风险对变量进行优先级划分修正权重,进而结合标准EEMUA 191—2013分配报警数目、优化报警阈值。通过TE模型验证,此方法能够有效减少17%~46%的报警数量。 Due to the unreasonable setting of alarm threshold,there are still a large number of problems of alarm flooding.In order to avoid the interference of too many invalid alarms and reduce the number of alarms,the alarm threshold is optimized based on knowledge and statistics.Firstly,the correlation between variables was analyzed by PCA(principal component analysis),and the importance of variables was determined,then the threshold was obtained by dividing the alarm number according to the weight and the international standard.However,the obtained threshold only relies on the data,which is one-sided.Therefore,on this basis,the variables are prioritized by combining the parameters such as consequence,time,frequency and so on,the weight is corrected,and the alarm number is allocated and the alarm threshold is optimized in accordance with the international standard.Verified by TE model,this method can effectively reduce the number of alarms by 17%~46%.
作者 杨振巍 王诚儒 雷方怡 Yang Zhenwei;Wang Chengru;Lei Fangyi(Safety and Environmental Protection Division,Jinxi Petrochemical Branch,Huludao 125000,China;College of Chemistry and Chemical Engineering,China University of Petroleum(East China),Qingdao 266580,China)
出处 《山东化工》 CAS 2023年第19期212-215,共4页 Shandong Chemical Industry
关键词 报警阈值 多变量 主元分析 优先级 alarm threshold multi-variable principal component analysis optimization safety
  • 相关文献

参考文献8

二级参考文献40

  • 1龚俭,梅海彬,丁勇,魏德昊.多特征关联的入侵事件冗余消除[J].东南大学学报(自然科学版),2005,35(3):366-371. 被引量:13
  • 2郭亚军.综合评价理论、方法及应用[M].北京:科学出版社,2002:211-218. 被引量:21
  • 3国家安全生产监督管理总局.山东省青岛市"11·22"中石化东黄输油管道泄漏爆炸特别重大事故调查报告[EB/0L].2014-01-11[2014-08-21].http://www.chinasafety.gov.cn/newpage/Contents/Channel5498/2014/0110/229142:ontent229142.htm. 被引量:1
  • 4Adnan N A, Izadi I, Chen T W. On expected detection delays for alarm systems with deadbands and delay-timers[J]. Journal of Process Control, 2011, 21(9):1318-1331. 被引量:1
  • 5Xu J W, Wang J D. Averaged alarm delay and systematic design for alarm systems[C]. Decision and Control (CDC), 2010 49th IEEE Conference on, Atlanta, Georgia, USA ,2010: 6821-6826. 被引量:1
  • 6Xn J W, Wang J D, Izadi I, et al. Performance assessment and design for univariate alarm systems based on FAR, MAR, and AAD[J]. IEEE Transactions on Automation Science and Engineering, 2012, 9(2): 296- 307. 被引量:1
  • 7Izadi I, Shah S L, Shook D S, et al.A framework for Optimal design of alarm systems[C].Proceedings of 7th 1FAC Symposium on Fault Detection, Supervision and Safety of Technical ProcessesBarcelona, Spain,2009:651-656. 被引量:1
  • 8Bergquist T, Ahnltmd J, Larsson J E, Alarm reduction in industrial process control[C].Emerging Technologies and Factory Automation, 2003 IEEE Conference, Louis, Missouri USA ,2003, 2: 58-65. 被引量:1
  • 9Kondaveeti S R, Izadi I, Shah S L, et al. On the use of delay timers and latches for efficient alarm design[C]. Control & Automation (MED), 2011 19th Mediterranean Conference on, Corfu Island, Greece,2011: 970-975. 被引量:1
  • 10Naghoosi E, Izadi I, Chert Tongwen, A study on the relation between alarm deadbands and optimal alarm limits[C].2011 American Control Conference,San Francisco, California USA2011: 3627-3632. 被引量:1

共引文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部