海子河一号特大桥左侧滑坡整治方案研究

STUDY ON THE LANDSLIDE CONTROL SCHEME ON THE LEFT SIDE OF HAIZI RIVER NO.1 SPECIAL BRIDGE
下载PDF
导出
摘要 依托盘兴铁路海子河1号特大桥6号~9号墩台基坑邻近滑坡体整治工程,结合现场工程地质及水文地质条件分析滑坡形成原因,从设计、施工等方面对滑坡加固工程进行了综合计算分析,针对滑坡1、2、3主轴不同情况,制订对应滑坡整治方案,并归纳总结滑坡整治具体施工顺序及注意事项,以期为相似工程条件下的滑坡整治提供参考与经验。 Based on the Pan xing railway haizi river 1 large bridge NO.6~NO.9 pier platform foundation pit adjacent landslide renovation project,combined with the field engineering geological and hydrogeological conditions of the cause of landslide,from the aspects of the design,construction of landslide 1,2,3 spindle,the corresponding landslide control scheme,and summarizes the landslide regulation specific construction order and matters needing attention,in order to provide reference and experience for landslide improvement under the condition of similar engineering.
作者 李亚光 Li Ya-guang
出处 《建筑技术开发》 2023年第11期128-130,共3页 Building Technology Development
关键词 边坡工程 滑坡原因 整治技术 方案比选 slope engineering landslide cause remediation technology scheme comparison
  • 相关文献

参考文献12

二级参考文献42

共引文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部