清嘉庆初年丰北大工合龙过程地图绘制研究 被引量:1

The Mapping of the Yellow River Fengbei Closure Project in Qing Dynasty's Early Jiaqing Period
原文传递
导出
摘要 丰北大工是嘉庆帝首遇的黄河堵口工程。自嘉庆元年(1796年)六月黄河漫口,至嘉庆二年正月二十七日大坝合龙,整个工程历时半年有余。漫口发生后,最初的抢修预案是堵筑漫口。嘉庆元年七月修改预案,即在漫口以南选择新坝基。历经两次蛰陷,又重新修订施工方案。嘉庆二年正月大坝终于合龙,二月进行善后工程。中国国家图书馆所藏7幅古地图,就是这次督抚丰北大工奏报的附图,形象地再现了这次大工的绘制过程。 The Fengbei Closure Project was the first large-scale project of blocking crevasses on the Yellow River dykes during the Jiaqing period,Qing dynasty.It lasted for over six months,from the breaching of the dykes in the sixth month of the first year of Jiaqing(1796)to the closure on the twenty-seventh day of the first month the next year(1797).After the dykes were breached,the initial emergency repair plan was to block the crevasse.The plan was revised the next month,and a new dyke foundation was constructed south of the crevasse.The construction plan had been revised after two collapses.After the dykes'closure,another construction was carried out the next month to cope with the aftermath.This paper presents the process of making the seven maps in the National Library of China collection,which are attachments to a memorial that local government officials reported to the emperor during the construction of the Fengbei Closure Project.
作者 乔雅 李新贵 Qiao Ya;Li Xingui
出处 《中国国家博物馆馆刊》 CSSCI 北大核心 2023年第9期82-91,共10页 Journal of National Museum of China
基金 国家社会科学基金重点项目“中国藏珍稀黄河古地图整理与研究”(项目批准号:21AZD128) 国家新闻出版署“十四五”重点图书出版项目“海内外珍稀黄河古地图整理与黄河治理保护研究” “宁夏哲学社会科学领军人才工程”阶段性成果。
关键词 丰北大工 地图绘制 事件史 嘉庆初年 Fengbei Closure Project mapping event history early Jiaqing period
  • 相关文献

参考文献4

  • 1翁莹芳,白鸿叶作,国家图书馆编..中国国家图书馆藏黄河历史文献[M].北京:学苑出版社,2022:607.
  • 2贾国静.咸丰初年黄河丰北决口与清廷的应对[J].徐州工程学院学报(社会科学版),2014,29(3):38-41. 被引量:1
  • 3殷继龙..清代黄河大工研究[D].吉林大学,2022:
  • 4中国第一历史档案馆编..嘉庆道光两朝上谕档 28[M].桂林:广西师范大学出版社,2000:512.

二级参考文献21

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部