城市轨道交通信号系统分段式改造方案 被引量:4

Phased Retrofi tting Scheme for Signaling System for Urban Rail Transit
下载PDF
导出
摘要 城市轨道交通部分线路的信号系统服役接近15年,信号系统改造迫在眉睫。传统的改造方案施工难度大、施工周期长、涉及设备多。提出一种分段式的改造方案,可降低成本提升效率,尽早解决既有车载设备故障率高给运营带来的影响。 As the urban rail transit signaling systems of some subway lines have been in service for nearly 15 years,there is an urgent need to retrofit such signaling systems.The traditional retrofitting solution has such problems as huge construction difficulties,long construction period,large amount of involved equipment.Thanks to technical development,it is possible to reduce the retrofitting costs of signaling systems.The paper provides a phased retrofitting solution,which can not only reduce the costs and increase the efficiency,but also eliminate as soon as the negative impacts of the failure rate of existing onboard equipment on subway operation.
作者 李洁 辛鑫 Li Jie;Xin Xin(Beijing Subway Operation Co.,Ltd.,Beijing 100044,China)
出处 《铁路通信信号工程技术》 2023年第10期80-85,共6页 Railway Signalling & Communication Engineering
基金 北京市地铁运营有限公司科研项目(2022000581015001)。
关键词 城市轨道交通 信号系统 分段式改造 自主感知 urban rail transit signaling system stage-based retrofitting autonomous perception
  • 相关文献

参考文献8

二级参考文献32

共引文献31

同被引文献50

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部