期刊文献+

高填方路基沉降数值模拟与现场监测分析 被引量:3

Numerical Simulation and On-site Monitoring Analysis of High-fill Roadbed Settlement
下载PDF
导出
摘要 高填方路基自重大,地基处治或施工质量控制不当会使道路结构产生较大沉降,对道路运行状况和行车安全造成较大影响。结合工程项目,采用有限元软件建立模型进行数值模拟分析,对不同施工阶段高填方路基的沉降进行计算。数值模拟计算结果与现场监测结果十分接近,模拟计算结果准确,可用于指导现场施工。 High-fill roadbed has a significant self-weight,and improper foundation treatment or construction quality control can cause significant settlement of the road structure,which has a significant impact on the road operation and driving safety.In combination with the engineering project,thenumerical simulation analysis is made by using the finite element software to establish the model and the settlement of high-fill roadbed at different construction stages is calculated.The numerical simulation calculation results are very close to the on-site monitoring results,and the simulation calculation results are accurate,which can be used to guide the on-site construction.
作者 贺佳 He Jia(Shanxi Jiaoke Highway Survey and Design Institute Co.,Ltd.,Taiyuan 030006,China)
出处 《北方交通》 2023年第10期26-29,共4页 Northern Communications
关键词 高填方路基 沉降 数值模拟 现场监测 High-fill roadbed Settlement Numerical simulation On-site monitoring
  • 相关文献

参考文献5

二级参考文献18

共引文献43

同被引文献26

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部