摘要
建筑工程中的深基坑施工是一项复杂而关键的工作。深基坑的施工技术涉及到基坑支护结构设计、土方开挖与处理、基坑支护施工方法、地下连续墙施工技术以及基坑排水与降水技术等方面。本文以绍兴高铁北站为例,详细介绍深基坑技术的概念、分类、施工目的和施工流程,并深入探讨了绍兴高铁北站基坑施工的实践过程。通过对实例的分析,可以更好地理解深基坑技术施工的工艺及实践,并为今后类似项目的施工提供借鉴。
The construction of deep foundation pits in construction engineering is a complex and critical task.The construction technology of deep foundation pits involves the design of foundation pit support structures,earthwork excavation and treatment,foundation pit support construction methods,underground continuous wall construction technology,and foundation pit drainage and precipitation technology.This article takes the north station of Shaoxing high speed railway as an example to provide a detailed introduction to the concept,classification,construction purpose,and construction process of deep foundation pit technology,which also delves into the practical process of foundation pit construction at the north station of Shaoxing high speed railway.By analyzing examples,it is possible to better understand the construction process and practice of deep foundation pit technology,and provide reference for similar projects in the future.
作者
杜加平
DU Jiaping(China Construction Civil Engineering Co.,Ltd.,Mianyang,Sichuan,621000,China)
出处
《智能城市应用》
2023年第9期40-43,共4页
Smart City Application
关键词
深基坑技术
施工工艺
实践
绍兴高铁北站
deep excavation technology
construction technology
practice
Shaoxing high speed rail north station