摘要
对旧桥加固施工过程进行监测,是确保施工质量和安全、实现加固目标的重要措施。本文以某跨江大桥(钢桁架高架铁路组合桥)维修加固工程为例,建立MIDAS建立有限元分析模型,以应力和变形为监测参数,完成了加固工程的施工监测工作、数值模拟分析和现场试验,可以为其他类似工程提供有益的参考和借鉴。
Monitoring the reinforcement construction process of old bridges is an important measure to ensure construction quality and safety,as well as to achieve reinforcement goals.This article takes the maintenance and reinforcement project of the Zhicheng Yangtze River Bridge(steel truss elevated railway combination bridge)as an example,establishes a finite element analysis model using MIDAS,with stress and deformation as monitoring parameters.The paper successfully completes the construction monitoring,numerical simulation analysis,and on-site testing of the reinforcement project.This can provide useful reference and reference for other similar projects.
作者
孙文君
Sun Wenjun(China Railway 18th Bureau Group Co.,Ltd.Tianjin,300000,China)
出处
《石家庄铁路职业技术学院学报》
2023年第3期68-71,共4页
Journal of Shijiazhuang Institute of Railway Technology
关键词
钢桁架
桥梁
养护加固
施工监测
steel truss
bridges
maintenance and reinforcement
construction monitoring