摘要
菲律宾瓦瓦供水项目大坝工程,位于菲律宾首都马尼拉大都会区东北部的黎刹省。工程建设中结合菲律宾瓦瓦供水项目大坝工程导流箱涵的体型特点,在国内外相关经验的基础上,对高边墙钢模移动台车进行了扩展与创新。应用结果表明:高边墙钢模移动台车符合工程实际,设计思路较为先进,实用价值高,为高边墙混凝土的快速、连续浇筑创造了有利条件,也对高边墙快速施工模板进行了补充和完善。本项目的成功经验可为海外其他类似工程项目的模板设计和使用提供借鉴。
The Wawa Water Supply Project is an important dam project located in the province of Rizal,northeast of Metro Manila,Philippines.Considering the characteristics of the diversion box culvert in the dam construction of Wawa Water Supply Project,this paper expands and innovates the design of a movable steel formwork trolley for the high side wall.Based on domestic and international experience,the application results demonstrate that the movable steel formwork trolley for the high side wall is practical and advanced,providing favorable conditions for rapid and continuous pouring of the high side wall concrete.It also supplements and improves the construction templates for high side wall rapid construction.The successful experience of this project can serve as a reference for template design and utilization in similar overseas engineering projects.
作者
胡月恒
张思哲
HU Yueheng;ZHANG Sizhe(Sinohydro Bureau 3 Co.,Ltd.,Xi’an 710024,China)
出处
《中国水能及电气化》
2023年第9期29-34,共6页
China Water Power & Electrification
关键词
高边墙钢模移动台车
设计应用
瓦瓦供水项目大坝工程
movable steel formwork trolley for high side wall
design and application
Wawa Water Supply Project