期刊文献+

钢筋数据从IFC向数控加工设备的传递

Transfer of Rebar Data from IFC to CNC Machining Equipment
下载PDF
导出
摘要 目前,在向钢筋数控加工设备录入钢筋尺寸时,仍然依赖于钢筋加工工人手工录入信息,这种方式既容易造成信息录入错误,也严重降低了钢筋加工效率。本文提出了一种从IFC文件提取钢筋加工数据,并将其以数字化方式传递给钢筋数控加工设备的方法。该方法从IFC文件中解析并提取钢筋实体信息,将其按BVBS格式进行编码后,再将编码转换为PDF417条码格式提交给钢筋加工工人;在钢筋加工厂,钢筋加工工人采用扫描二维码的方式将钢筋加工信息输入到MEP钢筋数控加工设备。该方法已在德州至上饶国家高速公路合肥至枞阳段项目得到成功应用。应用实践表明,该技术可将IFC格式的钢筋模型转换为数控加工文件,减少了工人读图、录入等中间环节,可以提高钢筋的加工效率和精度。 The rebar size is manually input into the numerical control processing equipment of the rebar by steel bar processing workers,which might lead to the error information input and seriously lowered processing efficiency of rebar.In response to it,a method of extracting steel processing data from the IFC file and digitally transmitting it to CNC rebar machining equipment was proposed in this paper,through which,rebar entity formation is parsed and extracted from the IFC file and then encoded in BVBS format.On this basis,the coded data converted into PDF417 barcode format is submitted to rebar processing workers.Rebar processing workers in the processing factory input rebar processing information into MEP rebar CNC machining equipment via scanning QR codes.This proposed method has been applied in the Hefei-Zongyang Section of the Dezhou-Shangrao National Expressway.The technology in the paper is proven to be effective in cutting the intermediate links such as workers’diagram reading and input and improving the processing efficiency and accuracy of rebar through converting the steel bar model in IFC format into CNC machining files.
作者 卢禹 韩磊 袁鹏 华攀 Lu Yu;Han Lei;Yuan Peng;Hua Pan(Hefei Branch of Shanghai Municipal Engineering Design Institute(Group)Co.,Ltd.,Hefei 230031,China;Anhui Transportation Holding Group Co.,Ltd.,Hefei 230031,China;Anhui Province Highway&Port Engineering Co.,Ltd.,Hefei 230031,China)
出处 《土木建筑工程信息技术》 2023年第3期81-85,共5页 Journal of Information Technology in Civil Engineering and Architecture
基金 安徽省交通控股集团有限公司科研项目(编号:JKKJ-2018-39)。
关键词 BIM IFC BVBS 数字化加工 BIM IFC BVBS Digital Processing
  • 相关文献

参考文献8

二级参考文献37

  • 1龙辉元.结构施工图平法与BIM[J].土木建筑工程信息技术,2011,3(1):26-30. 被引量:24
  • 2Schenck,D.A,W ilson,P.R.Inform ationModeling the EXPRESS W ay[]..1994 被引量:1
  • 3Gallaher,M.P,O’’Connor,A.C,John,L,mDettban,J,G ilday,L.T.'Cost Analysis of InadequateInteroperab ility in the U.S.Cap ital Fac ilities Industry'. NIST GCR 04-867 . 2004 被引量:1
  • 4Tolm an,F.Product mod ling standards for thebu ild ing and construction industry past,present and fu-ture[].Autom ation in Construction.1999 被引量:1
  • 5B jok,B-C.Requ irem ents and inform ation struc-tures for bu ild ing productmodels[].Techn ical ReportPublication VTT Techn ical Research Centre of F in land.1995 被引量:1
  • 6H ietanen,J.Information DeliveryManualGu id ing toComponents and Development Methods[].Bu ild ingSMART.2006 被引量:1
  • 7H ietanen,J.IFC Model V iew Defin ition Form at[]..2006 被引量:1
  • 8Kevin Yu,Thomas Froese,Francois Grobler.A development framework for data models for computer-integrated facilities management[J].Automation in Construction.2000(2) 被引量:1
  • 9刘照球,李云贵,吕西林,张汉义.基于IFC标准的结构动力分析信息扩展框架[J].华南理工大学学报(自然科学版),2010,38(7):122-127. 被引量:14
  • 10张建平.BIM技术的研究与应用[J].施工技术(下半月),2011,40(1). 被引量:114

共引文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部