期刊文献+

广西水资源监控能力建设二期项目运行维护实践

Operation and maintenance practice of Guangxi Water Resources Monitoring Capacity Construction Phase II Project
下载PDF
导出
摘要 2021年,国家水资源监控能力建设广西二期项目完成全部建设任务正式投入运行,有效改善了广西水资源监控手段缺乏、取水计量在线率偏低的问题。项目建成投入使用后,如何确保项目良性运行,持续发挥监控效益成为重要问题,本文通过分析2022年项目取用水监测站群的运行状况,提出运行维护主要对策。 As one of the components of National Water Resources Monitoring Capacity Construction Project,the Guangxi Water Resources Monitoring Capacity Construction Phase II Project was completed and officially put into operation in 2021,effectively improving the situation of lack of water resources monitoring means and low online rate of water intake metering in Guangxi.After the project is completed and put into use,how to ensure the healthy operation of the project and continuously bring into play the monitoring benefits has become an important issue.Based on analysis of the operation status of the water intake monitoring station group in 2022,countermeasures for operation and maintenance are put forward.
作者 黄文浦 李俊林 HUANG Wen-pu;LI Jun-lin(Guangxi Water Resources Management Service Center,Nanning 530023,China;Guangxi Water&Power Design Institute Co.,Ltd.,Nanning 530023,China)
出处 《广西水利水电》 2023年第4期123-125,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 水资源监控 取用水监测 运行维护 运行数据分析 Water resources monitoring water intake monitoring operation and maintenance analysis of operation data
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部