摘要
本文从施工条件、工程投资、进度、防渗效果和安全稳定等方面对合浦县总江水闸灌区西山倒虹吸涵管重建工程施工方案进行比选。根据工程所在的地理位置,重要程度、地质条件及风浪特性等要求确定了最优的施工方案。
For the Xishan Inverted Siphon Culvert Pipe Reconstruction Project located in Zongjiang Sluice Irrigation Zone,comparison and selection of construction schemes were conducted from the aspects of construction condition,cost,progress,anti-seepage effects,safety and stability.The optimum scheme was determined according to the geographical location,importance,geological conditions,wind and wave characteristics of the project.
作者
黄庆龙
HUANG Qing-long(Guangxi Water&Power Design Institute Co.,Ltd.,Nanning 530023,China)
出处
《广西水利水电》
2023年第4期65-68,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
倒虹吸
涵管
施工方案
土工膜
钢板桩
总江水闸灌区
Inverted siphon
culvert pipe
construction scheme
geomembrane
steel sheet pile
Zongjiang Sluice Irrigation Zone