摘要
为解决水利工程中长岸线防洪堤设计过程繁琐的问题,引入BIM技术对设计过程进行优化,运用Civil 3d在防洪堤设计过程的三维可视化及出图与工程量计算等功能,实现了防洪堤的平纵横出图以及工程量计算,提高了设计人员的工作效率,节约了时间成本,为BIM技术在水利工程中的应用提供了案例。
To address the cumbersome design process of levees for long shorelines in hydraulic engineering,this paper introduces BIM technology to optimize the design process.Through the use of Civil 3D in the 3D visualization and plotting of levee design process,as well as the calculation of engineering quantities,the horizontal,vertical,and horizontal plotting of levees have been achieved.It improves the working efficiency of designers,saves time and costs,and provides a case for the application of BIM technology in water conservancy engineering.
作者
魏昆仑
WEI Kun-lun(Xinjiang Institute of Water&Hydropower Engineering Investigation,Design and Research,Urumqi 830000,China)
出处
《云南水力发电》
2023年第7期141-143,共3页
Yunnan Water Power