摘要
针对大采高综采工作面回采过程中存在易倒架、刮板运输机上窜下移、顶板控制难、检修设备难等一系列现场管理难题。以某煤矿7 m大采高综采工作面为例,介绍了7 m大采高综采工作面回采过程中工程质量管理、顶板控制方法、设备存在问题处理等,为类似地质条件的大采高综采工作面回采现场管理提供一定的借鉴。
There are a series of on-site management problems in the process of fully mechanized mining face with high mining height,such as easy frame falling,scraper conveyor moving up and down,roof control difficult,maintenance equipment difficult and so on.Taking the 7 m large mining height fully mechanized working face in Bulianta Coal Mine as an example,this paper introduces engineering quality management,roof control method and equipment fine maintenance method in the process of working face mining.For similar geological conditions of large mining height fully mechanized mining face mining site management to provide a certain reference.
作者
刘兆祥
卞涛
李金刚
LIU Zhaoxiang;BIAN Tao;LI Jin gang(Bulianta Coal Mine,CHN Energy Shendong Coal Group Co.,Ltd.,Erdos 017209,China)
出处
《中国矿业》
2023年第S01期361-365,375,共6页
China Mining Magazine
关键词
大采高
综采工作面
工程质量
精细化检修
技术研究
large mining height
fully mechanized working face
construction quality
fine maintenance
technical study