镇城底矿针对23113工作面涌水量大问题,通过分析工作面的地质水文特征,提出采用注浆封堵工艺技术,通过设计注浆封堵方案,分析注浆封堵工艺。应用结果表明:采用注浆封堵工艺后,涌水量从180 m^(3)/h减小到54 m^(3)/h,降低了工作面奥灰水的出水风险。
In response to the problem of large water inflow in the 23113 working face,Zhenchengdi Mine proposed the use of grouting sealing technology by analyzing the geological and hydrological characteristics of the working face.Through designing grouting sealing schemes,the application of grouting sealing technology was analyzed.The results showed that the water inflow was reduced from 180 m^(3)/h to 54 m^(3)/h after using the grouting sealing technology,reducing the risk of water outflow from the Ordovician limestone water in the working face.
作者
王德志
Wang Dezhi(Shanxi Coking Coal Xishan Coal Electricity Group Zhenchengdi Mine,Taiyuan Shanxi 030053)
出处
《山西冶金》
CAS
2023年第5期234-235,250,共3页
Shanxi Metallurgy
关键词
综采工作面
涌水量
注浆封堵
工艺技术
fully mechanized mining face
water inflow
grouting sealing
process technology