期刊文献+

基于蒙特卡罗抽样的风险指引的安全裕度定量化方法研究

Study on the Quantitative Method of Risk-informed Safety Margin Based on Monte Carlo Sampling
下载PDF
导出
摘要 风险指引的安全裕度不同于核电传统的安全裕度,是近十年来核电行业提出的新的安全理念。文中将阐述核电传统安全裕度和风险指引安全裕度的内涵,研究风险指引的安全裕度的计算框架和蒙特卡罗抽样方法下的风险指引的安全裕度定量化技术。鉴于蒙特卡罗抽样方法下的风险指引的安全裕度定量化方法尚需完善,文中借鉴蒙特卡罗抽样次数估算方法和基于蒙特卡罗的可靠度计算方法,提出蒙特卡罗抽样方法下的风险指引的安全裕度的不确定度计算方法以及蒙特卡罗抽样次数的估算流程。 The risk-informed safety margin is a new safety concept of nuclear power industry in recent ten years,which is different from the traditional safety margin.This paper described the meaning of traditional safety margin and the risk-informed safety margin,studied the framework of risk-informed safety margin calculation and quantitative method of risk-informed safety margin based on Monte Carlo sampling.Referred to the Monte Carlo sampling method and reliability calculation method under Monte Carlo,this paper put forward the uncertainty calculation method of risk-informed safety margin based on Monte Carlo sampling and the process of determining the Monte Carlo sampling number.
作者 李朝君 韩治 郑洁 赵传奇 陈妍 李春 依岩 LI Chaojun;HAN Zhi;ZHENG Jie;ZHAO Chuanqi;CHEN Yan;LI Chun;YI Yan(Nuclear and Radiation Safety Center,MEE,Beijing 102400,China)
出处 《核科学与工程》 CAS CSCD 北大核心 2023年第1期200-205,共6页 Nuclear Science and Engineering
基金 国家重点研发计划项目(2018YFB1900305)。
关键词 风险指引 安全裕度 风险指引的安全裕度 蒙特卡罗抽样 Risk-informed Safety margin Risk-informed safety margin Monte Carlo sampling
  • 相关文献

参考文献3

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部