摘要
为探讨外立面幕墙施工工艺要点,本文以新湖明珠城三期幕墙工程为案例,首先介绍了工程施工难点,然后围绕外立面幕墙施工深入分析测量放线定位、预埋件制作与施工、幕墙制作与安装等工艺环节,不仅顺利完成幕墙工程建设,还节省了施工成本,这对于类似工程具有积极的借鉴意义,希望能够为相关从业人员提供参考。
In order to discuss the key points of facade curtain wall construction technology,this paper takes the Xinhu Pearl Town Phase III curtain wall project as an example to first introduce the difficulties of engineering construction,and then analyze the processes of measuring,setting-out of route,positioning,embedded parts production and construction,curtain wall production and installation targeting the facade curtain wall construction,which not only successfully completes the curtain wall engineering construction,but also saves construction costs,and has positive reference significance for similar projects,and hopes to provide reference for relevant practitioners.
作者
陈剑
Chen Jian(Shanghai Zhonghan Real Estate Co.,Ltd.,Shanghai 200071,China)
出处
《建筑与装饰》
2023年第10期150-152,共3页
Construction & Decoration
关键词
幕墙
埋件偏位
施工工艺
安装精度
curtain wall
embedding deviation
construction process
installation precision