摘要
针对大南湖西区五矿采掘不协调问题,深入分析后认为五矿巷道掘进慢主要是因为巷道掘进设备功能单一,相互协同性差,且施工时实行串行作业。鉴于此,提出采用快速掘锚系统及开发部分支护滞后支护技术改进当前五矿掘进系统。同时指出,快速掘锚系统与现场施工情况深度融合是后续主要的研究内容。
In view of the problem of uncoordinated mining and excavation in the No.5 Mine in the west area of the Great South Lake,after in-depth analysis,it is believed that the slow tunneling of the No.5 Mine is mainly due to the single function of the tunneling equipment,poor coordination and serial operation is implemented during construction.In view of this,it was proposed to improve the current excavation system of No.5 Mine by adopting the rapid excavation anchor system and developing partial support lagging support technology.At the same time,it was pointed out that the deep integration of the rapid excavation anchor system and the on-site construction is the main research content in the future.
作者
杜浩
DU Hao(Shanxi Dibao Energy Co.,Ltd.,Taiyuan 030045,Shanxi,China)
出处
《能源与节能》
2023年第5期147-149,共3页
Energy and Energy Conservation
关键词
快速掘锚系统
部分支护滞后支护技术
巷道掘进
fast driving and bolting system
partial support lagging support technology
roadway driving