摘要 通过对水下应急封井装置钻杆下入法进行参数敏感性分析,影响钻杆最大应力、最大有效张力、水下应急封井装置最大纵向位移以及安装姿态主要参数是浪高,波浪方向角和流速。根据正交试验将不同流速和浪高组合进行水下应急封井装置钻杆下放的动态仿真分析,将计算结果与水下应急封井装置下放作业极限准则进行对比,得到了波浪方向角0°、45°、90°、135°和180°的钻杆下放作业窗口,并进行安全区域的交集组合择取最优作业下放窗口,为后期现场下入作业提供重要指导。 The parameter sensitivity analysis was carried out by the drill pipe inversion method of underwater emergency well capping stack.The main parameters affecting the maximum stress,maximum effective tension,maximum longitudinal displacement and installation attitude of the underwater emergency well capping stack are wave height,wave direction angle and flow rate.Based on orthogonal experiments,dynamic simulation analysis was conducted for lowering the drill pipe of an underwater emergency well sealing device using different combinations of flow rates and wave heights.The calculation results are compared with the limit criteria of the underwater emergency sealing device,and the drill pipe lowering operation windows with wave direction angles of 0°,45°,90°,135°and 180°are obtained,and the optimal operation decentralization window is selected by the intersection of safety areas,which provides important guidance for the later on-site descent operation.
作者 肖谭 XIAO Tan(Deepwater Drilling Technology Branch,CNOOC Energy Technology&Service Co.,Ltd.,Haikou 570100,China)
出处 《化工管理》 2023年第14期53-55,共3页 Chemical Engineering Management
关键词 参数敏感性 仿真分析 作业窗口 parameter sensitivity simulation analysis operation window
  • 相关文献

参考文献6

二级参考文献32

  • 1李增刚.ADAMS入门详解与实例.北京:国防工业出版社,2007 被引量:4
  • 2张质文.起重机设计手册[M].北京:中国铁道出版社,1997.. 被引量:20
  • 3刘鸿义.材料力学[M].北京:高等教育出版社,1992.. 被引量:3
  • 4Marty Massey. Marine Well Containment Company Progress. OTC23596,2012. 被引量:1
  • 5Madhav Panwar, Frank Rusco. Interior Has Strengthened Its Oversight of Subsea Well Containment, but Should Im- prove Its Documentation. United States Government Accountability Office. 2012. 被引量:1
  • 6Stephen Rassenfoss. Deepwater Spill Control Devices Go Global . Journal of petroleum technology, 2012 (7) .48-53. 被引量:1
  • 7NTL No. 2010-N10. Statement of Compliance with Applicable Regulations and Evaluation of information Demonstrating Adequate Spill Response and Well Containment. USA: Bureau of Ocean Energy Manage- ment Regulation and Enforcement, 2010. 被引量:1
  • 8Alpipkin. BP Gulf Oil Leak Well-Head Repair an anthology part IV UPDATED [EB/OL]. [2013-04- 20 ]. http://alpipkin, com/blog/bp-gulf-oil-leak-well- head-repair-an-anthology-partiv/. 被引量:1
  • 9David Hammer. High-pressure deepwater well capping stack unveiled at offshore eonferenee[EB/OL]. [2013- 01-20]. http://www, nola. corn/news/gulf-oil-spill/ index, ssf/2011/05/high-pressure deepwater_ well_c. html. 被引量:1
  • 10Offshore Well Capping Devices Contract for Trendsetter [EB/OL]. [2013-04-20]. http://www, marinelink, corn/ news/offshore-contract-capping346004, aspx. 被引量:1

共引文献40

同被引文献16

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部