摘要
柳州市桐油山一号人防工程,洞高7.95 m,洞跨17.2 m,主洞长509 m,工程防水原设计采用喷锚混凝土支护(初支面)+土工织物+热熔垫片+PVC复合防水板+混凝土结构顶板的形式。工程实施时,防水板由射钉固定改为膨胀螺栓双垫片固定工艺,取得了良好的工程经济和质量效果,可为类似工程施工提供借鉴。
The No.1 civil air defense project of Tongyou Mountain in Liuzhou City has a tunnel height of 7.95 m,a tunnel span of 17.2 m,and a main tunnel length of 509 m.The original waterproof design of the project adopts the form of bolting and shotcreting(initial support surface)+geotextile+hot-melt gasket+PVC composite waterproof board+concrete structure roof.During the construction,the waterproof board is fixed with expansion bolts and double gaskets instead of nails,which achieves good engineering economic and quality effects,and can provide reference for similar engineering construction.
作者
凌志云
LING Zhiyun(Guangxi Construction Engineering Group No.3 Construction Engineering Co.,Ltd.,Liuzhou 545002,Guangxi,China)
出处
《建筑施工》
2023年第4期753-756,共4页
Building Construction
关键词
山体人防
防水板
止水垫片
锚固
mountain civil air defense project
waterproof board
water stop gasket
anchorage