摘要
木兰溪防洪工程白塘段是该防洪工程体系的关键内容之一,原工程存在防洪标准低,质量差,局部断堤距较窄,堤线布置不合理等问题。因此,对木兰溪防洪工程白塘段进行综合治理是十分必要的。基于此该文章论述了拟建的白塘段相关概况、工程地质与水文、洪水标准与建筑物等级、堤线布置原则等内容,针对拟建主要堤段堤线布置提出两种方案进行探讨,供后续类似参考。
The Baitang section of Mulanxi flood control project is one of the key contents of the flood control project system.The original project has problems such as low flood control standard,poor quality,narrow local breakwater distance,and unreasonable dike line layout.Therefore,it is very necessary to comprehensively harness the Baitang section of Mulanxi flood control project.Based on this,this article discusses the relevant overview of the proposed Baitang section,engineering geology and hydrology,flood standards and building grades,and the principles of dike line layout.Two schemes for the dike line layout of the proposed main dike section are proposed for discussion,for similar reference in the future.
作者
陈瑞椿
CHEN Ruichun(Putian City Hagiluxi Hydropower Management Office,Putian 351100,China)
出处
《河南水利与南水北调》
2023年第3期14-16,共3页
Henan Water Resources & South-to-North Water Diversion
关键词
防洪工程
地质与水文
建筑物等级
布置原则
堤线比选
flood control works
geology and hydrology
building grade
layout principle
comparison and selection of embankment line