摘要
本文利用uDL2对管道进行了24小时交流干扰检测,并对干扰规律以及防护方案进行了讨论。讨论结果表明:主要交流干扰源为电气化铁路;当管道与铁路交叉时,离交叉点越近,交流干扰程度越大;当管道路由与输电线路径相对关系发生变化时,变化点处交流干扰程度增大;该段管道需埋设4处排流地床,设置位置为YB18、Y20、Y06、Y05;现场缓解试验及计算结果表明,交流干扰治理需300m锌带。
This paper used uDL2 to detect the 24-hour AC interference of the pipeline,and discusses the interference law and protection scheme.The discussion results show that:the main source of AC interference is the electrified railway;when the pipeline intersects with the railway,the closer to the intersection,the greater the degree of AC interference;when the relative relationship between the pipeline route and the transmission line path changes,the AC interference degree at the change point is greater.4 drainage beds need to be buried in this section of the pipeline,and the setting positions are YB18,Y20,Y06,and Y05;the field mitigation test and calculation results show that 300 meters of zinc strips are required for AC interference control.
作者
朱昱庠
李舒根
万伟圆
ZHU Yu-xiang;LI Shu-gen;WAN Wei-yuan(Jiangxi Oil Transportation Branch of State Petroleum and Natural Gas Pipeline Network Group Co.,Ltd.Nanchang 330013,China)
出处
《全面腐蚀控制》
2023年第2期91-95,115,共6页
Total Corrosion Control
关键词
交流干扰
铁路
输电线
防护方案
AC interference
railways
power lines
protection schemes