摘要 某水电站地下厂房岩壁吊车梁为钢筋混凝土悬臂梁,由三排锚杆锚固在边墙上。通过重点分析各监测断面围岩面接缝开合度及围岩与混凝土梁体结合处锚杆应力变形,结合各断面围岩内锚杆应力和梁体混凝土钢筋应力,以及巡视检查结果,综合评价岩壁吊车梁荷载试验前的安全可靠性,为岩壁吊车梁荷载试验提供依据。 rThe rock wall crane beam in underground powerhouse ofa hydropowerstationisreinforced con⁃crete cantilever beam,which is anchored on the side wall by three rows of anchor bolts.By focus on the analysis of the joint opening on surrounding rock surface and the stress deformation of anchor bolts at the junction of surrounding rock and concrete beam,combined with the stress of anchor bolts in sur⁃rounding rock and the beam concrete reinforcement stress at each monitoring section,as well as the pa⁃trol inspection results,the safety and reliability of rock wall crane beam before load test are comprehen⁃sively evaluated,which can provide basis for the load test of rock wall crane beam.
作者 王晓强 吴露 唐欢欢 WANG Xiaoqiang;WU Lu;TANG Huanhuan(PowerChina Northwest Engi-neering Co.,Ltd.)
出处 《大坝与安全》 2023年第1期33-36,共4页 Dam & Safety
关键词 岩壁吊车梁 锚杆 监测断面 锚杆应力计 钢筋计 测缝计 rock wall crane beam anchor bolt monitoring section anchor stress meter reinforcement meter joint meter
  • 相关文献

参考文献1

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部