摘要
对运营期间的烈性呼吸道传染病医院进行改扩建会面临的设计难题,如在管线迁改设计中满足维持现状院区运营,分批次建设的施工时序要求,新旧管线综合交叉处理,海绵城市等建设要求,以广州市第八人民医院三期项目为例进行分析探讨处理策略。
For the design problems faced by the reconstruction and expansion of the hospital with severe respiratory infectious diseases during the operation period,such as meeting the construction sequence requirements of maintaining the current hospital area operation and batch construction,comprehensive cross treatment of old and new pipelines,sponge city and other construction requirements in the pipeline relocation design,taking the phase Il project of Guangzhou Eighth People's Hospital as an example,this paper analyzes and discusses the treatment strategies.
作者
管裕丰
谭大榔
苟红英
吴晓瑜
陈枫明
何国文
王嘉欣
黄祝开
GUAN Yufeng;TAN Dalang;GOU Hongying;WU Xiaoyu;CHEN Fengming;HE Guowen;WANG Jiaxin;HUANG Zhukai(Guangdong Province Building Science Designing Institute Co.,Ltd.,Guangzhou 510500,China)
出处
《给水排水》
CSCD
北大核心
2023年第3期128-132,共5页
Water & Wastewater Engineering
关键词
给排水管线迁改
维持现状运营
分批次建设
管线综合分析
海绵城市
Water supply and drainage pipeline relocation
Maintenance status quo operation
Batch construction sequence
Pipeline comprehensive analysis
Sponge city