南联山隧道施工中采用地质调查法、超前钻探法、物探法相互结合的预报技术,对不良地质段落超前预报,为施工措施的调整提供了可靠的依据,为地质灾害的预防提供有利保障。
In the construction of Nanlianshan Tunnel,geological survey method,advanced drilling method and geophysical prospecting method are combined to predict the bad geological passages in advance,which provides a reliable basis for the adjustment of construction measures and provides a favorable guarantee for the prevention of geological disasters.