摘要
某枢纽船闸所处航道沿线水资源匮乏,且船闸一次输水过程耗水量大,船闸需带省水功能。根据船闸最大工作水头及闸址地形条件,提出采用带1个省水池的短廊道集中输水系统布置方案。为解决省水船闸设计中的输水系统布置的水力学关键技术难题,通过采用130物理模型,对船闸非省水运行和省水运行时的输水系统水力特性、船舶(队)停泊条件进行了试验研究。结果表明:采用的输水系统布置合理可行,各项输水水力指标满足规范和设计要求。
Due to the channel that a ship lock located is lack of water resources,and the water consumption of one filling and emptying process is large,the ship lock should have water-saving function.According to the maximum difference between water level and the topographic conditions of the lock site,we propose a short-culvert filling and emptying system with a water-saving pool.To solve the key hydraulic problems of the filling and emptying system layout during the design of water-saving ship lock,we test the hydraulic characteristics and berthing conditions during lock filling and emptying with non-water-saving and water-saving operations by lock physical model with a scale of 1:30.The results show that the layout of the filling and emptying system is reasonable and feasible,and the hydraulic characteristics meet the specifications and design requirements.
作者
韩莹莹
刘海民
张丽媛
钱黎辉
HAN Yingying;LIU Haimin;ZHANG Liyuan;QIAN Lihui(CCCC Water Transportation Consultants Co.,Ltd.,Beijing 100007,China)
出处
《水运工程》
北大核心
2023年第3期121-126,共6页
Port & Waterway Engineering
关键词
省水船闸
输水系统
水力学特性
模型试验
water-saving ship lock
filling and emptying system
hydraulic characteristics
model test