风险管理在核岛主设备采购中的应用浅析 被引量:1

Simple Exploration on Risk Management in Procurement of Nuclear Island Main Equipments
下载PDF
导出
摘要 核岛主设备是核电厂建造期间需要重点关注的采购物项,其交付进度和质量保证对核电厂工程建设目标顺利达成至关重要。本文通过对核岛主设备采购中的范围管理、进度控制、质量控制、沟通协调等环节的风险进行识别评估,有针对性地提出风险防范和应对措施,探讨了风险管理在核岛主设备采购中的应用,为提升设备采购水平提供参考。 Items procurement shall be focused on nuclear island main equipments, which delivery schedule and quality assurance were crucial during the nulear power station construction. This paper introduced the risk identification and assessment about procurement scope, schedule control, quality control and communication process, and the countermeasures of risk prevention and control were be provided. It explored the application of risk management for nuclear island main equipments, in order to provide reference for enhancing the level of the procurement management.
作者 陈权 张鑫 高行 刘卫军 Chen Quan;Zhang Xin;Gao Hang;Liu Weijun(Huaneng Hainan Changjiang Nuclear Power Co.,Ltd.,Changjiang 572732,China)
出处 《核安全》 2023年第1期99-104,共6页 Nuclear Safety
关键词 风险管理 核岛主设备 采购 质量控制 风险防控 risk management nuclear island main equipments procurement quality control risk prevention and control
  • 相关文献

参考文献7

二级参考文献57

共引文献72

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部