期刊文献+

三峡建库前后宜昌水文站径流波动情势变化 被引量:3

Differences of Runoff Fluctuation Regime of Yichang Hydrologic Station After Construction of Three Gorges Reservoir
下载PDF
导出
摘要 针对水库建设前后径流波动情势的变化,基于宜昌站近70年长系列日径流过程,使用多个波动量化评估方法,从离散程度、趋势转变程度、陡度等角度对比分析了三峡水库建设前后不同时期下游径流波动情势的差异。结果表明,较天然径流情势而言,水库建设后径流的离散程度减小(主要在防洪库容预留期),径流的趋势转变程度增大、陡度减小(主要在消落期),总体上径流的波动情势变化复杂。 Aiming at the difference of the runoff fluctuation regime after the construction of reservoir, this paper adopted several fluctuation quantification methods to analyze the difference of downstream runoff fluctuation regime after the construction of Three Gorges reservoir from the dispersion, tendency and steepness change degrees on the basis of nearly 70-year long time series of runoff data at Yichang hydrologic station. Compared with the natural runoff regime, the results show that the dispersion degree of runoff decreases(mostly in flood control storage capacity reservation period), the tendency change degree of runoff increases and the steepness reduces(mainly in drawdown period), and totally the fluctuation regime changes intricately.
作者 王现勋 郑康 许银山 胡挺 姚华明 WANG Xian-xun;ZHENG Kang;XU Yin-shan;HU Ting;YAO Hua-ming(l.Hubei Key Laboratory of Petroleum Geochemistry and Environment,College of Resources and Environment,Yangtze University,Wuhan 430100,China;Bureau of Hydrology,Changjiang Water Resources Commission,Wuhan 430010,China;China Three Gorges Corporation,Yichang 443000,China;China Yangtze Power Co.,Ltd.,Yichang 443000,China;Hubei Key Laboratory of Intelligent Yangtze and Hydroelectric Science,Yichang 443000,China)
出处 《水电能源科学》 北大核心 2023年第2期7-10,共4页 Water Resources and Power
基金 国家自然科学基金联合基金重点项目(U1865201) 国家自然科学基金项目(51979198)。
关键词 水文情势 波动 水库调度 宜昌水文站 三峡水库 hydrology regime fluctuation reservoir regulation Yichang hydrological station Three Gorges Reservoir
  • 相关文献

参考文献4

二级参考文献68

  • 1艾欣,刘晓.基于可信性理论的含风电场电力系统动态经济调度[J].中国电机工程学报,2011,31(S1):12-18. 被引量:56
  • 2丘文千.抽水蓄能电站运行优化的动态规划模型[J].水电自动化与大坝监测,2005,29(6):6-10. 被引量:19
  • 3徐得潜,韩志刚,翟国寿,刘新建,李世东.抽水蓄能电站与火电站配合运行优化模型研究[J].水力发电学报,1996,15(4):11-20. 被引量:16
  • 4YAN Maosong , ZHANG Shaohua. Probabilistic simulation and optimal operation for pumped-storage plants// Proceedings of 2nd International Conference on Advances in Power System Control, Operation and Management: Vol 1, Dec China. Stevenage, UK : IEE, 7-10, 1993 Hong Kong, 1993: 578-583. 被引量:1
  • 5LIANG R H. A noise annealing neural network for hydroelectric generation scheduling With pumped-storage units. IEEE Trans on Power Systems, 2000, 15 (3) 1008-1013. 被引量:1
  • 6GAO Huimin, WANG Chao. An optimal operation scheduling method of pumped storage Station and thermal power station coordination// Proceedings of IEEE 2006 Power Systems Conference and Exposition: Vol 1, Oct 29-Nov 1, 2006, Atlanta, GA, USA. Piscataway, NJ, USA:IEEE, 2006.. 1829-1832. 被引量:1
  • 7Chen Chun-Lung. Optimal wind-thermal generating unit commitment[J] IEEE Transactions on Energy Conversion, 2008, 23(1): 273-280.". 被引量:1
  • 8Hetzer J, Yu D C. An economic dispatch model incorporating wind power[J]. IEEE Transactions on Power Energy Conversion, 2008, 23(2): 603-611. 被引量:1
  • 9Pappala V S, Erlich I, Rohrig K, et al. A stochastic model for optimal operation of a wind-thermal power systems[J]. IEEE Transactions on Power Systems, 2009, 24(2): 940-950. 被引量:1
  • 10Constantinescu E M, Zavala V M, Rocklin M, et al. A computational framework for uncertainty quantification and stochastic optimization in unit commitment with wind power generation[J]. IEEE Transactions on power systems, 2011, 26(1): 431-441. 被引量:1

共引文献138

同被引文献43

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部