大跨度钢结构连廊错层拼装同步提升控制技术 被引量:3

Synchronous lifting control technology for split-floor assembling of long-span steel structure corridor
下载PDF
导出
摘要 以东西汇项目高空钢结构连廊为背景,根据连廊构件自重大、结构高度高的特点,结合现场实际施工条件,综合考虑工程造价成本、工程质量以及工程工期等目标,介绍了错层拼装+一次提升+低空连接+二次提升+高空补杆的施工方式,提前插入胎架和钢结构施工工序,对节省工期、降低成本有显著效果,还大大降低了高空拼装的施工安全风险,并通过有限元计算进行设计和施工校核,为国内同类工程提供了有效借鉴。 According to characteristics of the connecting corridor components’ high self-weight and high structure, meanwhile considering with the actual construction condition and quality, controlling of construction cost and shortened the construction period. In this paper, the construction method of split-layer assembling+once lift+low altitude connection+twice lift+high altitude reinforcement bar is introduced and the construction procedure of tube frame and steel structure is inserted in advance, which not only can save the construction period and the cost reduction has significant effect. What is more, but also reduces the construction safety risk of aerial assembly. In the end, the finite element calculation design and construction check, provides an effective reference for similar domestic projects.
作者 王振海 陈果 王博 Wang Zhenhai;Chen Guo;Wang Bo(WE PARK(Hengqin)Development Company Limited,Zhuhai 519000,China)
出处 《山西建筑》 2023年第5期99-102,114,共5页 Shanxi Architecture
关键词 大跨度钢结构 连廊 错层拼装 同步提升 long-span steel structure corridor split-layer assembly synchronous lifting
  • 相关文献

参考文献6

二级参考文献41

共引文献129

同被引文献13

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部