期刊文献+

Over 12%efficient kesterite solar cell via back interface engineering 被引量:2

下载PDF
导出
摘要 Kesterite Cu_(2)ZnSn(S,Se)_(4)(CZTSSe)has attracted considerable attention as a non-toxic and earthabundant solar cell material.During selenization of CZTSSe film at high temperature,the reaction between CZTSSe and Mo is one of the main reasons that result in unfavorable absorber and interface quality,which leads to large open circuit voltage deficit(VOC-def)and low fill factor(FF).Herein,a WO_(3)intermediate layer introduced at the back interface can effectually inhibit the unfavorable interface reaction between absorber and back electrode in the preliminary selenization progress;thus high-quality crystals are obtained.Through this back interface engineering,the traditional problems of phase segregation,voids in the absorber and over thick Mo(S,Se)_(2)at the back interface can be well solved,which greatly lessens the recombination in the bulk and at the interface.The increased minority carrier diffusion length,decreased barrier height at back interface contact and reduced deep acceptor defects give rise to systematic improvement in VOCand FF,finally a 12.66%conversion efficiency for CZTSSe solar cell has been achieved.This work provides a simple way to fabricate highly efficient solar cells and promotes a deeper understanding of the function of intermediate layer at back interface in kesterite-based solar cells.
出处 《Journal of Energy Chemistry》 SCIE EI CAS CSCD 2022年第12期321-329,I0008,共10页 能源化学(英文版)
基金 supported by the National Key R&D Program of China(no.2018YFE0203400) the National Natural Science Foundation of China(no.62074102) the Guangdong Basic and Applied Basic Research Foundation(no.2022A1515010979) the Science and Technology plan project of Shenzhen(nos.JCYJ20190808120001755 and 20220808165025003)。
  • 相关文献

同被引文献12

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部