某发电厂锅炉排渣系统干除渣改造后,在炉渣湿放过程中频繁发生扬尘问题,超出相关环保规定。对此,进行了分析,查找造成扬尘的根源,并提出改进措施。采用改进措施后,炉渣湿放过程中的扬尘符合规定标准。
After the renovation of dry deslagging of the boiler slag discharge system of a power plant, dust emission frequently occurred during the discharge process of wet slag, exceeding the relevant environmental protection regulation.In this regard, an analysis was carried out to find out the root cause of the dust emission, and the improvement measure was proposed.After the adoption of improvement measure, the dust emission in the discharge process of wet slag meets the specified standard.