摘要
目前,井塔模式的提升系统工程被越来越多煤矿采纳,井塔工程作为提升系统安装的主要先前部分,井塔施工的工期及质量要求优为重要,采用什么模式的施工工艺才能更好更快的完成井塔工程交付给安装施工,是每个项目考虑的重重之重。
At present,more and more coal mines have adopted the hoisting system engineering of the shaft tower model.As the main part of the hoisting system installation,the construction period and quality requirements of the shaft tower construction are very important.What kind of construction technology can be used to better and faster complete the shaft tower project and deliver it to the installation construction is a heavy consideration for each project.
作者
王芳波
WANG Fang-bo(Mechanical and Electrical Installation Engineering Department of China Coal First Construction Co.,Ltd.,Handan 056002,China)
出处
《价值工程》
2023年第1期74-76,共3页
Value Engineering
关键词
煤矿井塔
剪力墙
钢框木胶板
施工工艺
coal mine shaft tower
shear wall
steel frame wood plywood
construction technology