期刊文献+

某超限高层建筑复杂连体结构设计 被引量:4

Design of an out-of-code high-rise building with complex connective structure
下载PDF
导出
摘要 某连体建筑两侧塔楼体型差异较大,为超限高层复杂连体建筑,采用框架-剪力墙+连体桁架的结构体系。针对连体桁架结构选型进行优化分析,针对连体结构整体模型,进行小震弹性分析、中震性能化验算和大震动力弹塑性分析。随后对连体结构的关键问题进行了研究,包括关键构件和节点的设计、抗连续倒塌能力以及大震下结构的变形和损伤情况。分析结果表明,超限高层复杂连体结构的结构体系合理,具有较好的整体性,关键构件和节点的设计均能达到预设的性能目标,且连体结构具有较好的抗连续倒塌能力。 The shape of towers on both sides of a connective building is quite different,it belongs to an out-of-code tall building with complex connective structure.The frame-shear wall structural system with connecting truss was adopted.The truss type selection of connective structure were analyzed and optimized.The elastic analysis of frequently-occurred earthquake,performance based seismic design of fortification earthquakes and the dynamic elastic-plastic analysis of rarely-occurred earthquake were carried out.Finally,the key points of connective structure were discussed,including design of key members and joints,the capability of the anti-progressive collapse,the deformation and damage of the structure under rarely-occurred earthquake.The analysis results show that the adopted structure system is suitable to the out-of-code tall building with complex connective structure and has well integrity,the design of key members and joints can reach the prescribed performance target and the connective structure has well anti-progressive collapse capability.
作者 黄明 王志兰 施明征 HUANG Ming;WANG Zhilan;SHI Mingzheng(Architects&Engineers Co.,Ltd.of Southeast University,Nanjing 210096,China)
出处 《建筑结构》 北大核心 2023年第2期29-34,共6页 Building Structure
关键词 超限高层建筑 复杂连体结构 连体桁架 抗连续倒塌 out-of-code high-rise building complex connective structure connecting truss anti-progressive collapse
  • 相关文献

参考文献7

二级参考文献6

共引文献28

同被引文献29

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部