期刊文献+

南流江大渡槽施工导流方案的比选、计算与施工 被引量:1

Comparison, Calculation and Construction of Construction Diversion Scheme for Nanliu River Aqueduct
下载PDF
导出
摘要 施工导流方案的合理选择对整个工程施工的顺利展开具有重要的意义。笔者以旺盛江水库的南流江大渡槽的施工导流工程为例,详细介绍了筑岛+过水围堰+钢栈桥、筑岛+埋管+钢栈桥、水中架设钢平台和分期导流围堰等4种施工导流方案,并从工程基本因素和导流建筑物施工等方面进行比选,推荐采用筑岛+过水围堰+钢栈桥方案。水力计算和施工工法的分析结果表明,该推荐优选方案在该实际工程中是具有可靠性、可行性和施工便利性的。 The reasonable selection of construction diversion scheme is of great significance to the smooth development of the whole project. Taking the construction diversion project of Nanliu River Aqueduct of Wangshengjiang Reservoir as an example, the author introduces four construction diversion schemes in detail,such as island construction+overwater cofferdam+steel trestle, island construction+buried pipe+steel trestle,steel platform erection in water and staged diversion cofferdam, and compares them from the basic factors of the project and the construction of diversion buildings. The scheme of island construction+overwater cofferdam+steel trestle is recommended. The analysis results of hydraulic calculation and construction method show that the recommended scheme is reliable, feasible and convenient in the actual project.
作者 赖成联 LAI Chenglian(Guangxi Water&Power Design Institute Co.,Ltd.,Nanning 530023,China)
出处 《红水河》 2022年第6期33-37,共5页 Hongshui River
关键词 施工导流 渡槽 比选 水力计算 施工工法 construction diversion aqueduct comparison hydraulic calculation construction method
  • 相关文献

参考文献5

二级参考文献19

共引文献52

同被引文献25

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部