期刊文献+

阿海水电站技术供水系统运行优化 被引量:2

Operation Optimization of Technical Water Supply System of Ahai Hydropower Station
下载PDF
导出
摘要 技术供水作为水轮发电机组的重要辅助设备,对保证机组安全运行具有重要作用。阿海水电厂自2012年首台机组投产发电以来已有10a,技术供水系统管路在长期持续运行下,相关部件已发生不同程度的老化和损坏,通过对技术供水运行方式进行优化,降低系统耗水率和缺陷发生率,提高了机组运行的经济性和安全性。 As an important auxiliary equipment of hydro-generator unit, technical water supply plays an important role in ensuring safe operation of unit. It has been 10 years since the first unit of Ahai Power Plant was put into operation in 2012. Under the long-term continuous operation of technical water supply system pipelines, the related components have experienced various degrees of aging and damage. By optimizing the operation mode of technical water supply, the water consumption rate and defect rate of the system are reduced, and the economy and safety of the unit operation are improved.
作者 金波 JING Bo(Yunnan Huadian Jinsha River Midstream Hydropower Development Co.,Ltd.,Ahai Power Generation Branch,Lijiang 674100,China)
出处 《云南水力发电》 2022年第12期319-321,共3页 Yunnan Water Power
关键词 减压阀改造 流量控制 管路选材 系统优化 modification of pressure release valve flow control pipeline material selection system optimization
  • 相关文献

参考文献7

二级参考文献8

共引文献68

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部