摘要
在大型水利工程施工中,以计划管理综合技术进行进度管理、人力资源管理、设备管理以及安全管理,并合理分析计划管理各个阶段所需的准备工作,进而在有效发挥计划管理综合技术后,提升大型水利工程施工质量与效率。
In the construction of large-scale hydraulic projects, the key measures of schedule management,human resource management, equipment management and safety management are integrated with plan management technology, to analyze the preparation work required in each stage of plan management, effectively exert the comprehensive technology of plan management, and improve the construction quality and efficiency of large-scale hydraulic engineering.
出处
《江苏建材》
2022年第6期145-146,共2页
Jiangsu Building Materials
关键词
大型水利工程
计划管理
进度管理
技术分析
large hydraulic engineering
planning management
schedule management
technical analysis