期刊文献+

某悬臂式抗滑桩倾斜原因分析及处置

Tilting Cause Analysis and Disposal of a Cantilever Anti-Slide Pile
下载PDF
导出
摘要 通过对某悬臂式抗滑桩发生倾斜过程分析,从桩身结构强度、桩嵌入长度、桩后工程加载、桩前土体水平承载力、桩前开挖扰动等方面剖析了抗滑桩倾斜原因;桩后超载、桩前临空导致桩倾斜,采用预应力锚索加固的处置方案,为类似工程处置提供参考。 By analyzing the tilting process of a cantilever anti-slide pile,the reasons for the tilting of anti-slide pile are analyzed from the aspects of pile structural strength,pile embedding length,post-pile engineering loading,horizontal bearing capacity of soil in front of pile and excavation disturbance in front of pile.Pile tilt is caused by overload after pile and air in front of pile The solution of prestressed anchor cable reinforcement is adopted to provide reference for similar engineering disposal.
作者 王勇 杨全忠 张元元 王业 WANG Yong;YANG Quan-zhong;ZHANG Yuan-yuan;WANG Ye(Sichuan Geological Engineering Group Co.,LTD.,Chengdu 610017)
出处 《四川地质学报》 2022年第4期611-614,共4页 Acta Geologica Sichuan
关键词 滑坡 抗滑桩 倾斜 悬臂桩 锚索加固 水平承载力 landslide anti-slide pile lilt cantilever pile anchor cable reinforcement horizontal bearing capacity
  • 相关文献

参考文献9

二级参考文献52

共引文献399

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部