驮英水库及灌区工程机电设备安装和现场施工的协同配合 被引量:5

Coordination between electromechanical equipment installation and civil construction for Tuoying Reservoir Irrigation Zone Project
下载PDF
导出
摘要 驮英水库共设有钢闸门14扇,拦污栅2扇,门槽、栅槽24孔,启闭设备14台(套)。灌区工程共设有闸门(拦污栅)859孔857扇,启闭设备857套。文章就工程建设中机电设备安装与土建施工过程中常见的协调配合问题进行分析、对其产生的原因及解决方法进行探索和总结。 Tuoying Reservoir is designed with 14 sets of steel gates, 2 sets of trash racks, 24 holes of gate or rack slots and 14 sets of hoisting equipment. Tuoying Reservoir irrigation zone is designed with 857 sets of gates or trash racks, 859 holes of gate or rack slots and 857 sets of hoisting equipment. The authors analyze the problems frequently seen in the coordination between electromechanical equipment installation and civil construction, explore and summarize the causes and solutions.
作者 姚越 黄天炎 黄理明 YAO Yue;HUANG Tian-yan;HUANG Li-ming(Zuojiang River Drought Control Project Management Center,Chongzuo 532200,China)
出处 《广西水利水电》 2022年第6期71-73,78,共4页 Guangxi Water Resources & Hydropower Engineering
关键词 机电设备 安装工程 土建施工 协调配合 驮英水库及灌区工程 Electromechanical equipment installation work civil construction coordination Tuoying Reservoir Irrigation Zone Project