期刊文献+

工程总承包项目发包人要求策划的核心要素及案例研究——以ZY市垃圾焚烧发电项目为例 被引量:4

The Core Elements and Case Studies of the Planning of the Employer’s Requirements in the General Contracting Project:Taking the Municipal Solid Waste Incineration Power Generation Project in ZY City as an Example
下载PDF
导出
摘要 工程总承包模式下发包人要求是招标文件重要组成部分,对项目成败至关重要。从工程总承包项目功能交付过程的内在逻辑来剖析编制发包人要求的前提条件,形成发包人要求编制策划框架,进一步明确了发包人要求编制策划核心要素的实施过程,并用案例验证。研究成果将为发包人要求编制提供理论依据和实践指导。 Under the EPC model,the employer’s requirements are an important part of the bidding documents,and it is also an important reason for the success of the EPC project.The EPC requirements planning framework is formed by analyzing the prerequisites for developing the requirements of the contractor from the inherent logic of the functional delivery process of the project,and further clarifies the implementation process of core elements of the employer requirements planning,and uses a case to verify.The results will provide theoretical basis and practical guidance for the preparation of the requirements of the employer.
作者 严玲 王婉怡 宁延 YAN Ling;WANG Wanyi;NING Yan(School of Management,Tianjin University of Technology,Tianjin 300384,China;School of Engineering Management,Nanjing University,Nanjing 210008,China)
出处 《建筑经济》 北大核心 2022年第12期29-37,共9页 Construction Economy
基金 国家自然科学基金项目(72072126) 天津市高校创新团队培养计划(TD13-5019)。
关键词 工程总承包项目 发包人要求 编制策划 核心要素 案例研究 general contracting project employer’s requirements compilation and planning core elements case study
  • 相关文献

参考文献7

二级参考文献30

共引文献31

同被引文献25

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部