为了BIM技术能够更好的在水电水利工程中得到充分的落地应用,本文以两河口水电工程机电专业的三维正向协同设计应用实践作为切入点,总结了协同设计过程中的重难点,详细阐述了采用“区域划分、超前设计、迭代更新”的方法开展协同设计工作,取得了较好的成效。最后对BIM技术在现有设计成果基础之上的信息化应用进行了探索研究与思考,对水电水利工程运用BIM技术进行全生命周期的应用价值挖掘具有参考借鉴意义。
In order to apply BIM technology better and fully in hydropower and hydraulic projects,this paper takes the practice of 3D collaborative design in the electrical and mechanical design of Lianghekou Hydropower Plant as cut-in point,summarizes the important and difficult points in the process of 3D collaborative design,and elaborates on the works carried out by the methods of region division,advance design and iteration update,which achieved great results.At last,the information application of BIM technology based on the completed designs is explored,researched and thought,which has reference significance for the application value mining of the whole life cycle with BIM technology in the hydropower and hydraulic projects.
作者
朱毅
孙立鹏
孙文彬
ZHU Yi;SUN Lipeng;SUN Wenbin(Power China Chengdu Engineering Corporation Limited,Chengdu 610072,China)
出处
《大电机技术》
2022年第6期78-85,共8页
Large Electric Machine and Hydraulic Turbine