摘要
为指导监理做好涨壳式预应力中空锚杆质量控制工作,文章从施工图审阅核对、施工方案审查、原材料进场验收、施工过程质量控制等方面进行分析,明确各阶段工序监理质量控制的具体工作内容及要求,为监理工作提供参考。
In order to guide the supervisor to do a good job in the quality control of shell type prestressed hollow anchorage,this paper analyzes the construction drawing review and verification,construction scheme review,raw material mobilization acceptance,construction process quality control and other aspects,and defines the specific work contents and requirements of the quality control of each stage and process supervision,and provide reference for supervision.
作者
张翔健
ZHANG Xiangjian(China State Railway Group Co.,Ltd.,Beijing 100844,China)
出处
《工程质量》
2022年第11期74-77,共4页
Construction Quality
关键词
涨壳式预应力中空锚杆
监理
质量控制
shell type prestressed hollow anchorage
supervision
quality control