摘要
龙王头湾大桥为三门湾项目的控制性工点,移动模架施工则是工程的重中之重。根据项目实际施工情况,围绕移动模架,详细介绍施工中所遇到的问题及其注意事项,希望为以后类似工程施工提供借鉴参考。
Longwangtouwan bridge is the controlling construction site of Sanmenwan project,and the mobile formwork construction is the top priority.According to the actual construction situation of the project,this paper introduces the problems encountered in the construction and matters needing attention in detail,which will provide reference for the similar construction.