摘要
在三峡船闸梯级枢纽运行期间,要运用联合调度算法完成各项基础任务,以此保障实践工作效益实现最大化。在我国交通能源建设水平不断提高中,以生态文明和低碳环保为核心的枢纽建设得到了全社会的重视,各领域学者在深层探究枢纽优化调度目标的同时,获取了更多基础理论和解决方法,这对现代三峡船闸梯级枢纽联合调度系统建设而言具有积极影响。因此,本文研究在明确优化调度多目标算法的基础上,根据三峡葛洲坝梯级枢纽建设运行情况,深藏探讨实际三峡船闸梯级枢纽联合调度算法的应用效果。
During the operation of the Three Gorges ship lock cascade hub,the joint scheduling algorithm should be used to complete various basic tasks,so as to ensure the maximization of practical work benefits.With the continuous improvement of my country's transportation energy construction level,the construction of hubs centered on ecological civilization and low-carbon environmental protection has attracted the attention of the whole society.Scholars in various fields have obtained more basic theories and solutions while deeply exploring the objectives of hub optimization and dispatching,which has a positive impact on the construction of the modern Three Gorges ship lock cascade hub joint dispatch system.Therefore,on the basis of a clear optimal scheduling multi-objective algorithm,according to the construction and operation of the Three Gorges Gezhouba cascade hub,this paper deeply discusses the application effect of the actual Three Gorges ship lock cascade hub joint scheduling algorithm.
作者
邓伟
余绍军
DENG Wei;YU Shaojun(Hunan Bio-Mechatronics Vocational and Technical College,Changsha Hunan 410000;School of Computer and Information Engineering,Central South University of Forestry and Technology,Changsha Hunan 410000)
出处
《软件》
2022年第9期10-13,共4页
Software
基金
湖南省科技创新基金项目(CX2015B297)。
关键词
优化调度
调度目标
三峡船闸
梯级枢纽
联合调度
多目标算法
optimal dispatch
dispatch objective
Three Gorges ship lock
cascade hub
joint dispatch
multiobjective algorithm