摘要 以某深水半潜式平台为研究对象,针对1400 m工作水深的12点系泊系统,采用时域耦合分析方法对比分析南海某设计工况下张紧式系泊与悬链线式系泊平台的运动响应和系泊缆动力特性,进而研究极端载荷作用下受力最大的系泊缆断裂时二者的变化情况。结果表明:与悬链线式系泊相比,无论是完整状态抑或是破断状态,张紧式系泊均具有更好的系泊性能,但聚酯缆材料的刚度非线性程度较大。分析结果可为系泊系统的设计与选择提供参考。 For a deep-water semi-submersible platform and a 12-point mooring system with a working depth of 1400 m,the time-domain coupling analysis method is applied to compare the motion response of the platform and the tension of the mooring lines of the taut mooring system with those of the catenary mooring system under certain design condition in the South China Sea.The changes of the platform motion response and mooring lines tension after mooring line breakage under extreme load are also analyzed.The result shows that compared with the catenary mooring,the taut mooring is of better mooring performance in both intact and broken states,but the nonlinear stiffness of the polyester cable material is obvious.The analysis results can provide reference for the design and selection of mooring system.
作者 闫宏生 高率群 李怀亮 于文太 孟祥伟 YAN Hongsheng;GAO Shuaiqun;LI Huailiang;YU Wentai;MENG Xiangwei(School of Civil Engineering,Tianjin University,Tianjin 300072,China;Offshore Oil Engineering Co.,Ltd.,Tianjin 300452,China)
出处 《中国海洋平台》 2022年第5期18-24,61,共8页 China offshore Platform
基金 工信部“深水半潜式生产储卸油平台工程开发”(编号:MC-202030-H04)。
关键词 半潜式平台 张紧式系泊系统 悬链线式系泊系统 时域耦合 系泊破断 semi-submersible platform taut mooring system catenary mooring system time-domain coupling mooring line breakage
  • 相关文献

参考文献13

二级参考文献86

  • 1何家雄,夏斌,施小斌,姚永坚,刘海龄,阎贫,张树林.世界深水油气勘探进展与南海深水油气勘探前景[J].天然气地球科学,2006,17(6):747-752. 被引量:64
  • 2韩凌,杜勤.深水半潜式钻井平台锚泊系统技术概述[J].船海工程,2007,36(3):82-86. 被引量:16
  • 3I)el Vecchio. Light weight material for deep water moorings [ D]. University of Reading, 1992. 被引量:1
  • 4Femandes, Del Vecchio. Mechanical properties of polyester mooring cables[J]. International Journal of Offshore and Polar Eng4neering, 1999,9(3) :208 - 213. 被引量:1
  • 5Webster. Mooring induc .ed damping[ J]. Ocean Engineering, 1995, 22: 571 - 591. 被引量:1
  • 6Triantafyllou, Bliek & Shin. Dynamic analysis as a tool for open-sea mooring system design[J]. SNAME transactions, 1985, 93:303 - 324. 被引量:1
  • 7Bliek. Dynamic analysis of single span cables[D]. MIT, 1984. 被引量:1
  • 8Kitney & Brown. Efficient prediction of mooring line dynamic loading with experimental verification[A]. Proceedings of International Conference on Offshore Mechanics and Arctic Engineering[C]. 1998. 被引量:1
  • 9API, Recommended practice for design and analysis of stationkeeping systems for floating structures[ S]. 1995. 被引量:1
  • 10DNV.DNV-OS-E302.Offshore Mooring Chain[S].DNV Publication,2008. 被引量:1

共引文献144

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部