针对星村煤矿综放工作面过断层期间存在的风险,通过采取不同的措施对顶板、冲击地压防治、防灭火风险进行管控和管理,有效的解决了工作面过断层期间的风险,保证了工作面的正常回采。
In view of the risks existing during the fault crossing of the fully mechanized top coal caving face in Xingcun coal mine,different measures are taken to control and manage the risks of roof,rockburst prevention and fire prevention and extinguishing,which effectively solves the risks during the fault crossing of the working face and ensures the normal mining of the working face.
作者
公为梅
王绪胜
秦鹏
GONGWeimei;WANG Xusheng;QINPeng(Shandong Tianan Mining Grouplimited company,Qufu273100,China)
出处
《煤矿现代化》
2022年第5期36-39,共4页
Coal Mine Modernization
关键词
冲击地压
综放工作面
过断层
安全技术研究
rock burst
fully mechanized top coal caving face
cross fault
safety technology research