期刊文献+

特大桥边跨结合梁步履式顶推施工技术 被引量:1

Construction Technology of Walking-pedrail Incremental Launching of Grand Bridge Side-span Combined Beam
下载PDF
导出
摘要 顶推法是桥梁工程中一项重要的梁部施工方法,以其机械化程度高,占地面积小,操作集中在施工平台完成,避免大量使用脚手架节约资金和时间等优点,在施工中得到广泛应用。文章结合青石岩特大桥的施工实践,针对桥梁步履式顶推施工技术质量控制要点进行了分析,可为类似工程提供参考。 Incremental launching method is an important beam construction method in bridge projects. It is widely applied in construction due to its advantages of high mechanization degree, small occupied area, centralized operation on the construction platform, avoidance of excessive scaffolding to save money and time, etc. Quality control key points of bridge walking-pedrail incremental launching construction technology are analyzed based on the construction practice of Qingshiyan Grand Bridge, thereby providing reference for similar projects.
作者 赵越 ZHAO Yue(China Railway 18th Bureau Group Co.,Ltd.,Tianjin 300222,China)
出处 《中国水能及电气化》 2022年第9期16-20,41,共6页 China Water Power & Electrification
关键词 钢混结合梁 步履式顶推 质量控制 steel-concrete combined beam walking-pedrail incremental launching quality control
  • 相关文献

参考文献8

二级参考文献63

共引文献79

同被引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部