市政高架桥跨越高速公路桥梁施工方案比选 被引量:4

Comparison and Selection of Construction Schemes for Municipal Viaduct Crossing Expressway
下载PDF
导出
摘要 顶推施工和节段吊装施工是交叉跨越工程中经常选用的两种施工方案,两种方案各有优缺点,采用何种施工方案,应根据项目特点、造价要求及项目所在位置处的交通情况综合比选,对于交通量较大的建议采用顶推施工,对于交通量较小的建议采用节段吊装施工。 Incremental launching construction and segmental hoisting construction are two construction schemes often used in crossing projects.Each scheme has its own advantages and disadvantages.The construction scheme to be adopted should be comprehensively compared and selected according to the project characteristics,cost requirements and the traffic conditions at the project location.It is recommended to adopt the incremental launching construction for large traffic volume and segmental hoisting construction for small traffic volume.
作者 柴加兵 Chai Jiabing(Liaoning Provincial Transportation Planning and Design Institute Co.,Ltd.,Shenyang 110166,China)
出处 《北方交通》 2022年第9期28-31,共4页 Northern Communications
关键词 高架桥 跨跃高速公路 组合梁 顶推施工 节段吊装施工 Viaduct Crossing expressway Composite beam Incremental launching construction Segmental hoisting construction
  • 相关文献

同被引文献18

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部