济南市顺河快速路南延建设工程交通后评估分析

Traffic Post-Evaluation Analysis of South Extension Construction Project of Shunhe Expressway in Jinan
下载PDF
导出
摘要 交通后评估是检验道路建设工程建成通车后交通运行情况与设计前期预测情况符合程度的一项重要内容。以济南市顺河快速路建设工程为例,通过建设前现状交通分析、建设前交通预测、运营期交通分析对工程通车后运营情况进行总结,获得了区域交通持续性改善及周边路网优化的建议,并为后期快速路的运维提供参考。 Trafficpost-evaluation is an important content to check the consistency between the traffic operations after the road construction project is completed&opened to traffic and the pre-design prediction.Taking the construction project of Shunhe Expressway in Jinan as an example,the operation situation after the project is opened to traffic is summarized through the traffic analysis before construction,traffic prediction before construction&traffic analysis during the operation period,and the suggestions for the continuous improvement of regional traffic&the optimization of surrounding road network are obtained,which may provide reference for the operation&maintenance of expressway in the later period.
作者 张翼 周康静 路源 ZHANG Yi;ZHOU Kang-jing;LU Yuan(Jinan Municipal Engineering Design&Research InstituteCo.,Ltd.,Jinan 250003,China)
出处 《中国市政工程》 2022年第4期4-7,117,共5页 China Municipal Engineering
关键词 快速路 交通后评估 服务水平 交通改善 expressway traffic post-evaluation service level traffic improvement

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部