摘要
针对坡月水库工程环境及施工特点,在大坝混凝土施工过程中,从混凝土配合比设计、原材料的质量控制、混凝土拌和、运输、浇筑、养护等方面进行精心组织控制,科学管理,整个工程混凝土满足结构设计强度、施工和易性、耐久性等要求,工程项目经质量验收和运行使用,质量良好。
In view of the environmental and construction characteristics of Poyue Reservoir Project,the concreting construction of main dam was carefully organized and controlled in respects of the concrete mix proportion design,quality control of raw materials,mixing,transport,pouring and curing of concrete.The concrete quality of the whole project meets the requirements for design structural strength,construction workability and durability.The project has passed the quality acceptance and is operating well.
作者
黄飞华
黄泽
覃俊铵
HUANG Fei-hua;HUANG Ze;QIN Jun-an(Guangxi Vocational College of Water Resources and Electric Power,Nanning 530023,China)
出处
《广西水利水电》
2022年第4期84-86,89,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
混凝土
施工质量
控制措施
坡月水库
Concrete
construction quality
control measure
Poyue Reservoir