基于某单相接地故障下的人因失效分析 被引量:1

Analysis of Human Failures Based on Single⁃Phase Grounding Fault
下载PDF
导出
摘要 某海外电厂在工程建设阶段发生电缆被盗事件,引发6 kV系统单相接地故障,继而造成设备损坏,暴露出该工程自建设以来一系列人因失效问题。对事故发生原因进行分析,从工程设计、施工、调试、管理等多个角度指出失效的关键原因,并给出应急处理措施和整改意见,为更多同类项目建设提供参考。 A cable stolen incident occurred during the construction period of an overseas power plant,which caused a single⁃phase grounding fault of the 6 kV system.It caused equipment damage,which exposed a series of human failure problems since the construc⁃tion of the project.Through the analysis of the cause of the accident,the key reasons for the failure are pointed out from multiple angles of engineering design,construction,commissioning,management,etc.Emergency treatment measures and rectification opinions are given,so as to provide reference for the construction of more similar projects.
作者 李琛 LI Chen(Liaoning Dongke Electric Power Co.,Ltd.,Shenyang,Liaoning 110179,China)
出处 《东北电力技术》 2022年第6期36-39,共4页 Northeast Electric Power Technology
关键词 人因失效 单相接地故障 事故分析 应急处理 human failure single⁃phase grounding fault accident analysis emergency treatment
  • 相关文献

参考文献8

二级参考文献41

共引文献90

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部